- Westmore Avenue (St. Charles to Division)
Create an Account - Increase your productivity, customize your experience, and engage in information you care about.
Project Location(s): | North Westmore Avenue from St. Charles Road to Division Street |
---|---|
Project Status: | Planning |
Bid Opening Date: | TBD |
Mandatory Pre Bid Meeting: | TBD |
QuestCDN Number: | TBD |
Construction Start Date: | TBD |
Construction Completion Date: | TBD |
Contractor: | TBD |
Construction Engineer: | TBD |
Design Engineer: | TBD |
Awarded Contract Amount: | TBD |
Adjusted Final Contract Amount: | TBD |
Funding Source(s): | Street Referendum, Wastewater Fund, Sewer Separation, Water Supply Fund, IEPA Water Loan |
To improve the condition of the roadway by means of selected pavement rehabilitation methods. To reduce the severity and frequency of flooding and sewer backups by separating the existing combined sewer.
This project consists of improvements on North Westmore Avenue from St. Charles Road to Division Street. The project includes combined sewer separation. Some selective water and sanitary system improvements are also included. The water main would be the continuation of a 10-inch "backbone" for the water system.
The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. This project is to be partially funded by voter approved bond proceeds. It has been determined by the Combined Sewer Separation Study that this street is a high priority for sewer separation.
Bidding will be conducted online through the bidding service QuestCDN. More information will be posted when it becomes available.
Date | Description |
---|---|
January 1, 2021 | This project is in the planning stages. |