Maple Area Improvements

General Information

Project Location(s):Various (see map)
Project Status:Design
Bid Opening Date:TBD
Start Date:TBD
Completion Date:TBD
Contractor:TBD
Construction Engineer:TBD
Design Engineer:Edwin Hancock Engineering Company
Awarded Contract Amount:TBD
Adjusted Final Contract AmountTBD
Funding Sources:Street Improvement Fund, GO Bonds, Water Supply Fund, Wastewater Fund, Sewer Separation Fund.

Objective

To improve the area of the roadway by removing the existing deteriorated pavement and replacing it with new, structurally sound pavement. To reduce the frequency and severity of flooding and sewer backups by separating the existing combined sewer.

Description

This project consists of the reconstruction of selected areas on East Maple Ave, North Summit Ave, East Oak St, East Pine St, East Division St, and North Myrtle Ave within the Village of Villa Park. The project includes combined sewer separation. Some selective water and sanitary sewer system improvements are also included.

Justification

The Village's pavement management program has determined that the condition of these streets has deteriorated to the point that pavement rehabilitation is needed. This project is to be partially funded by voter approved bond proceeds.

Bidding Documents

  • None at this time.

Contract Documents

Project Documents

Planholders

OrganizationOrganization Address
None at this time

Project Updates

Posted DateDescription 
December 13, 2018Design of the project is ongoing.
October 5, 2018A letter was sent to residents within the project area notifying them of ongoing survey work for the project.