Active Projects
-
2019 Sewer Rehabilitation Program
The Village has identified areas of the sewer network that are in need of rehabilitation. The rehabilitation efforts will reduce the inflow and infiltration (I/I) of both stormwater and debris into the sanitary sewer system, thus lessening both the frequency and severity of sewer surcharges and sewer backups. The life of the existing sewer will also be extended.
Link to page -
Charles Avenue Improvement Project
This project consists of the reconstruction of North Charles Avenue from St. Charles Road to Oak Street. The project includes combined sewer separation. The project also includes replacement of the existing 4'' water main. Some selective sanitary sewer system improvements are also included.
Link to page -
College Streets Improvement Project
This project consists of the replacement of existing 4" and 6" water mains on North Iowa Avenue from Stone to Vermont, on North Michigan Avenue from Stone to Vermont, and on West Vermont Street from Wisconsin to Harvard. The project will also include pavement improvements on Iowa and on a portion of Michigan Avenue.
Link to page -
Combined Sewer Separation
Link to page -
Harvard Avenue (Jefferson Park to Plymouth)
Link to page -
Maple Area Improvement Project
This project consists of road pavement reconstruction of areas of Maple, Pine, Oak, Myrtle, Summit, and Division and the separation of any combined sewers located in those areas.
Link to page -
Michigan Avenue (Kenilworth to Central)
This project consists of pavement improvements on South Michigan Avenue from Central Boulevard to Kenilworth Avenue and the separation of the existing combined sewer main.
Link to page -
Plymouth Street Improvement Project
This project consists of improving Plymouth Street from Ardmore Avenue to Villa Avenue in the Village of Villa Park which includes hot-mix asphalt (HMA) resurfacing and HMA pavement reconstruction. The total length of improvements is 2,594 feet (0.49 mile). The pavement resurfacing areas will consist of 2” of HMA surface course and ¾” of polymerized leveling binder. These resurfacing areas will also have pavement patching and spot curb and gutter replacement based on field conditions. In addition, there will be sidewalk replacement at intersections to meet the Public Right-of-Way Accessibility Guidelines (PROWAG), driveway reconstruction, drainage and utility improvements, pavement markings, signing, erosion & sediment control, and landscaping.
Link to page -
Sugar Creek Watershed Drainage Improvement Project
This project is a combination of the South Michigan Avenue Improvement (Madison to Jackson), Jackson Pond Overflow, Jackson Pond Outlet Project, and other upcoming projects.
Link to page -
Third Avenue (Holly to Division)
Separation of the existing combined sewer on N Third Ave between Holly Ct and Division St.
Link to page -
Washington Corridor Sewer Separation
This project consists of the reconstruction of South Monterey avenue from Washington Street to Park Boulevard and Highland Avenue from Monterey Avenue to Route 83. The project includes combined sewer separation on Monterey from Washington to Highland and Highland from Monterey to Route 83. Some selective water system and sanitary system improvements are included. Monterey - Park to Highland is the first stage of this project, and must be completed before the next stages can begin.
Link to page -
Yale Avenue (Plymouth to Ridge)
This project consists of the reconstruction of North Yale Avenue from Plymouth Street to Ridge Road. The project includes replacement of the existing water main. Some selective sanitary sewer system improvements are also included.
Link to page