Project Location(s): | North Biermann Avenue from Sunset Drive to North Avenue |
---|---|
Project Status: | Planning |
Bid Opening Date: | TBD |
Mandatory Pre Bid Meeting: | TBD |
QuestCDN Number: | TBD |
Construction Start Date: | TBD |
Construction Completion Date: | TBD |
Contractor: | TBD |
Construction Engineer: | TBD |
Design Engineer: | TBD |
Awarded Contract Amount: | TBD |
Adjusted Final Contract Amount: | TBD |
Funding Source(s): | Street Referendum, Water Supply Fund, Wastewater Fund |
To improve the condition of the roadway by means of selected pavement rehabilitation methods. To improve water system capacity and reliability by replacing the existing water main.
This project consists of the rehabilitation of North Biermann Avenue from Sunset Drive to North Avenue. The project also consists of the replacement of the existing water main, including fire hydrants, valves and water services. The project also includes some selective sanitary system improvements.
The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. The pavement improvements are to be partially funded by voter approved bond proceeds. The existing water main has a high incidence of water main breaks. The Illinois EPA Public Water Supply Loan Program (PWSLP) may provide loan funding for the water main improvements.
The project will be bid online though the bidding service QuestCDN. More information will be posted as it becomes available.
Date | Description |
---|---|
January 19, 2021 | Planning for the design phase of the the project is underway. |