Village Parking Lots
Description
This project consists of pavement improvements at two Village parking lots: the Community Development parking lot at 325 East North Avenue (approximately 1,150 square yards); and the Fire Station #2 parking lot at 102 West Plymouth Street (approximately 900 square yards). The project includes the hot‑mix asphalt overlay of both parking lots, pavement patching, and other related and incidental work.
Bidding Documents
Planholders
Organization | Organization Address |
---|---|
Bid Tool | 14205 N. Mopac, Suite 550 Austin, TX 78728 |
Chicagoland Paving | 225 Telser Road Lake Zurich, IL 60047 |
Accu-Paving Co. | 2665 S. 25th Avenue Broadview, IL 60155 |
Pavement Systems | 13820 California Blue Island, IL 60406 |
Brothers | 315 S. Stewart Avenue Addison, IL 60101 |
Orange Crush | 321 Center Street Hillside, IL 60162 |
Project Updates
Posted Date | Description |
---|---|
November 27, 2015 | Staff is working to install the parking bumpers in the Museum Lot and all other construction work has been completed. |
November 20, 2015 | All asphalt paving has been completed. The historical museum parking lot needs pavement markings and parking bumpers installed, this work will be completed by Staff. |
November 13, 2015 | Resurfacing of the parking lot at the historical museum was completed this week. |
October 30, 2015 | Resurfacing of the parking lot at the historical museum is tentatively expected to begin the next two to three weeks. |
September 25, 2015 | A change order for the resurfacing of the parking lot at the historical museum was approved at the 09/14/2015 Village Board meeting. The change order add the parking lot work to the existing contract for the 2015 Street Resurfacing Project. |
September 18, 2015 | Staff has obtained three price quotations for the resurfacing of the parking lot at the historical museum and presented a change order to an existing contract to the Village Board for approval. We also met on-site to discuss possible re-configuration of the parking lot, including the addition of a second entrance. We are recommending that these actions be deferred until the reconstruction of Central Boulevard. The entire curb along the parking lot would be replaced at that time and it would be the appropriate time to reconfigure the parking lot. |
September 4, 2015 | Staff has obtained three price quotations for the resurfacing of the parking lot at the historical museum and intends to present a change order to an existing contract to the Village Board for consideration. |
July 10, 2015 | Staff completed installation of parking curbs at the Kenilworth TIF parking lot this week. Staff has completed striping of the Kenilworth TIF, Jefferson Pool, and Community Development parking lots. Striping of the Fire Station parking lot must still take place. |
May 29, 2015 | Staff worked on striping of the Kenilworth TIF parking lot this week. |
May 22, 2015 | Staff completed striping of the Jefferson Pool parking lot this week. Striping of the other parking lots must still take place. Some additional work, including installation of signage and parking curbs, must also be completed. |
May 15, 2015 | Staff worked this week to perform tasks related to closeout. |
May 8, 2015 | Contractual construction of this project has reached final complete. Public Works staff must still complete some work in-house, including striping and installation of parking curbs. This work is expected to start next week and take several weeks to complete. |
May 1, 2015 | Construction of this project continued this week. Final asphalt surface paving was completed at all four parking lots. Staff is now working to inspect all the work and identify any punch list work which may remain. Public works staff must also complete some work in-house, including striping and installation of parking curbs. This work is expected to take place in the next several weeks. |
April 24, 2015 | Construction of this project began this week. Pavement patching of all four parking lots was completed this week. Milling began today, and should be completed before the end of the week. Surface paving is tentatively expected to take place next week. |
April 10, 2015 | Staff has obtained a proposal for pavement improvements at two additional parking lots (Jefferson Pool and Kenilworth TIF) and has submitted that proposal for consideration by the Village Board at the 04/13/2015 Village Board Meeting. |
April 3, 2015 | Staff is working to add two additional Village parking lots to this project. |
March 20, 2015 | A pre-construction meeting was held on 03/17/2015. Construction is tentatively expected to begin in mid-April. |
March 13, 2015 | A pre-construction meeting is scheduled for 03/17/2015. A tentative schedule will be determined at that time. |
October 24, 2014 | This project was advertised for bidding today, 10/24/2014. Staff completed preparation of the bid manual and plans for the project this week. |
Contact Us
-
Michael Guerra, P.E.
Public Works Director
Email the Engineering Division
Online Contact Form
Staff Directory
Office Address
Public Works Department
11 West Home Avenue
Villa Park, Illinois 60181
Mailing Address
Public Works Department
20 South Ardmore Avenue
Villa Park, Illinois 60181
Ph: 630-834-8505
Fx: 630-834-8509
Emergency: 630-834-7447
Hours
Monday through Friday
7:30 a.m. to 4:00 p.m.